All Categories

PPR hot melt machine, water pipe hot melt machine, 20-63 water and electricity engineering plastic welding machine, heat capacity container, non stick mold head

Operation points of hot melt connection of pipes and fittings: After the heating time is reached, immediately put the pipes and fittings together.The pipe fittings are removed from the heating jacket and the heating head at the same time, and are inserted in a straight line at a constant speed without rotation.At the marked depth, a uniform flange is formed at the adapter.

Get a Free Quote

Our representative will contact you soon.
Email
Mobile/WhatsApp
Name
Company Name
Message
0/1000
image

More Faq Us

Frequently Asked Questions?

We are based in Henan, China, start from 2019,sell to North America(40.00%),Western Europe(30.00%),Mid East(20.00%),Southeast Asia(10.00%). There are total about 11-50 people in our office.

Always a pre-production sample before mass production; Always final Inspection before shipment;

Garden Scissors/Screwdriver/Tape Measure/Utility Knife/Pruning Shears

Probon Tools with three production factories under its jurisdiction. The quality complies with national export standards. The performance of production equipment is advanced, and various testing facilities are complete.

Accepted Delivery Terms: FOB,EXW,Express Delivery; Accepted Payment Currency:USD,EUR,CAD,AUD,GBP,CNY; Accepted Payment Type: T/T,L/C,D/P D/A,Credit Card,PayPal; Language Spoken:English,Chinese,Japanese